We turn your spreadsheets, paper checklists and the “it lives in the foreman’s head” processes into one working tool — built for your plant. At a fraction of the cost and time of a traditional software house.
EU Machinery Regulation 2023/1230 applies from 20 January 2027 — with no transition period. Operator certifications keep expiring in waves. Is your documentation ready?
No waiting six months for a system that “almost works”
The same result, without burning the budget
Your ERP stays; we add what is missing on the shop floor
The round is filled in on a sheet of paper, the sheet ends up in a binder on the manager’s shelf. When a safety inspection or an ISO audit arrives, you spend half a day proving the check was done at all. No history, no audit trail, no control.
“I am looking for tools that actually help, not ones that just »generate reports« out of »empty data«” — maintenance manager
Breakdown history and machine know-how sit in one technician’s head and in their program on their computer. When they leave or go on holiday, you are back to writing reports by hand. Three times slower.
“we do not have enough support inside the organisation to keep maintaining the system”
SAP is there, but it never reaches shop-floor processes. A software house? You know how that ends — slow, expensive, “just one more sprint”. And an off-the-shelf CMMS is so bloated that you use 10% of it and it still does not fit your reality.
“SAP turned out to be too complex and too expensive to give machine operators access to”
1 safety inspection without documentation = fines in the $7,500 – 11,000 range + machine shutdown
Manual reporting and re-typing = 15-30 hours a week that do not have to be manual
A burned IT rollout = $15,000 – 37,000 + 4-6 months lost
An off-the-shelf CMMS = you use 10% of the features, pay for 100% — and it still does not fit the shop floor
Named operator certifications for forklifts and lifting equipment expire on rolling schedules. Anyone whose paperwork is not in order is working without valid certification — which means fines and personal liability for the plant management.
Another customer audit or inspection, and you are digging through binders again. Another technician leaves and takes the knowledge of half your machines with them. Another 15-30 hours a week sunk into spreadsheets.
New requirements for machinery — with no transition period. A “substantial modification” (including a digital one) shifts the manufacturer’s obligations onto your plant: a new risk assessment, documentation, CE marking. Whoever does not prepare their processes takes on personal liability.
Your competitors are already digitising and will be inspection-ready. You? The question is not “whether to get processes and documentation in order” — it is “whether you make it before those dates”.
A dedicated layer over one painful process in your plant — inspections, audits, breakdown reports or machine documentation. Not another off-the-shelf CMMS. Not an SAP replacement. A system built for your reality, delivered in weeks.
We sit down with your process and find where spreadsheets and paper cost you most. You get a concrete report with recommendations.
We assemble 80% from proven RapidCMS modules; the remaining 20% is built for you. The same result as a software house, on a completely different timeline.
We launch on the shop floor, train the team and run it in the cloud on our side — your IT person never has to touch the code.
No more paper and spreadsheets — rounds, checklists and breakdown reports from a phone or tablet, with a QR scan
Inspection-ready in 2 clicks — an audit report for safety and ISO inspections, signed and timestamped
The process no longer rests on one person — knowledge and history live in the system, not in a technician’s head
A working module in 3-4 weeks — RapidCMS covers ~80% of the process, the rest we build with AI-Assisted Engineering
RapidLogic is a new brand, but not a new team. We have already built inspection, fault-reporting and technical documentation apps for industry leaders:
Hard metrics and a testimonial — coming soon. Let us be straight with you: what you see above is the founder’s track record (~200 projects, 15+ years), not “a RapidLogic client achieved X%”. The first case study under our own name — with hours recovered, penalties avoided and a client quote — goes live after the first deployment. Want to be that client? Let us talk about a pilot.
A dedicated layer over one process — a mobile/web app for the shop floor plus an admin panel
80% from ready RapidCMS modules — checklists, roles, dashboard, PDF report generator, alerts
Integration with your ERP/SAP over API — no core migration
Hosting, maintenance and development on our side — zero load on your IT
Cloud maintenance + SLA (Pro package)
Data export with no vendor lock-in — your data stays yours
| Bonus | Value | Micro | Starter | Pro |
|---|---|---|---|---|
| Free digital audit — at least 3 areas of savings | $1,250 | Yes | Yes | Yes |
| Data migration out of spreadsheets | $750 | Yes | Yes | Yes |
| ROI pack “ammunition for the board” — a 1-pager to defend the project | $500 | Yes | Yes | Yes |
| “Grasp it in an hour” — onboarding + training video | $500 | — | Yes | Yes |
| 30 days of concierge support — a dedicated contact | $500 | — | Yes | Yes |
| Audit guarantee — if the report fails an ISO or safety inspection, we fix it free of charge | $750 | — | Yes | Yes |
| Total value of bonuses | ~$4,250 |
Your investment: from $3,000 (Micro) / from $7,500 (Starter). Here is what you lose every month without a system.
| What you lose today | Calculation | Cost |
|---|---|---|
| Manual reporting and re-typing | 20 hrs/week × ~$15 × 50 weeks | ~$15,000 / year |
| 1 missed safety inspection | Fine + machine shutdown | $7,500 – 11,000 |
| 1 unplanned stoppage from an avoidable breakdown | Lost production | thousands of dollars / day |
The time recovered on reporting alone is on the order of ~$15,000/year. Add one avoided safety penalty ($7,500 – 11,000) and one avoided stoppage. The Starter package (from $7,500) typically pays for itself within the first weeks of time saved — and the first compliance incident avoided covers it in full.
We map your process and point out at least 3 areas of savings. Zero commitment, a concrete report with recommendations.
We agree the MVP scope, ERP/SAP integrations and what the audit report has to look like for safety and ISO inspections. You get pricing, a roadmap and a timeline.
We assemble the layer (80% ready from RapidCMS + 20% built for you). We show working screens along the way — you see progress as it happens, not after six months.
We launch on the shop floor, train the team (“grasp it in an hour”) and migrate the data out of spreadsheets. Then 30 days of concierge support with a dedicated contact. After that: the system runs in the cloud, maintained on our side, with your data exportable at any moment.
I am Krzysztof Gromadzki — I have been building IT systems for manufacturing and logistics companies for 15+ years. Not a theorising agency: a builder with product experience.
Over 15+ years I have delivered ~200 IT projects — that is pattern recognition in shop-floor processes. I also built NutriBot: a SaaS system taken from zero to 4M PLN of annual revenue. The industrial deployments I ran were for Keller, Hydro and Xafy — forklift inspections, fault reporting, QR checklists and technical documentation. The same pattern you are dealing with: machines, inspections, breakdowns, documentation, compliance.
I understand the shop floor, not just the code. I speak the language of process, downtime and compliance — not corporate jargon. Because I have watched plants burn budgets on software houses and buy CMMS platforms they use 10% of.
I am not an agency that builds you a website and moves on to the next client. I am a builder who has built, scaled and run operational systems for industry — exactly the kind your plant needs. I understand your shop floor, your processes and your constraints. And I know you do not need another off-the-shelf CMMS — you need a layer over one painful process that simply works.
30% discovery, 40% delivery, 30% on acceptance. The industry standard is 50-100% up front. You do not pay for a promise — you pay for working screens.
The free digital audit will find at least 3 areas of savings in your plant. If it does not, we refund its cost. The risk is on our side.
If a report from the system does not pass an ISO or safety inspection, we fix it free of charge. We design the layer for audits from day one.
Full functionality on trial for 60 days, credited 100% if you continue. No software house or CMMS vendor offers this.
Three ProcessKit packages — you pick the scope, we deliver. A one-off project plus predictable maintenance (no per-seat counting; operators report for free).
The full system on trial before you commit to a full rollout
Named forklift operator certifications expire in waves. Working without valid certification means fines and personal liability for whoever signed off the schedule.
New requirements for machinery — with no transition period. A “substantial modification” (including a digital one) shifts the manufacturer’s obligations onto your plant.
Fines in the $7,500 – 11,000 range plus an immediate machine shutdown. An inspection without documentation is not a question of “if”, only “when”.
We work one client at a time — we take on a limited number of rollouts per month so that each one is delivered properly. This is not a factory — it is a partnership.
Companies that get their processes and documentation in order before those dates pass inspections calmly. The rest will be firefighting under pressure. The earlier you start, the cheaper and calmer it gets.
One painful process, a working module in 3-4 weeks, ready for inspection. Let us start with a free audit — with no commitment we will show you where you lose the most.
P.S. If your plant still runs on paper checklists, spreadsheets and knowledge that lives “in the foreman’s head” — this is not a question of “whether” you need a change. It is a question of “when”. Operator certifications keep expiring in waves. The EU Machinery Regulation applies from 20 January 2027, with no transition period. And the sooner you start, the cheaper and calmer it gets. A single compliance incident avoided covers the cost of the rollout.
P.P.S. Remember the audit value guarantee: if we do not identify at least 3 areas of savings, you owe nothing. The risk is on my side.